Intervention of the ETE Guiana technical team for the emergency repair at night of a container ship's hull damaged.
Sub-Saharan Africa – Leasing contract for the supply of electrical generators and forklifts
Supply and construction of a 4500 m2 galvanizing plant in Blida under an EPCI contract for COLINCO. ETE prepared technical and other specifications, as well as blueprints for the various workshops, managed invitations to tender and the selection of subcontractors and monitored progress and implementation of the project.
Supply of 499 towers (35,000 tons) and additional materials to create a 260 km high-voltage electrical power line between Hassi Berkine and Nezla with selection and management of an industrial partner in Turkey.
ETE supplied in Gabon 11,000 tons of casing from a selected industrial partner in China. ETE managed the completed project including: industrial certifications, follow up on production and guarantee the proper shipment of merchandise on site.
ETE oversaw operations at the Andra’s underground research and storage site for radioactive wastes from 2007 to 2010.
Construction of a 14,000 m2 operational base in Port Gentil under an EPCI contract for Weatherford in 2010. ETE prepared technical and other specifications, designed the blueprints for hangars and workshops, managed tenders and subcontractors, monitored progress and proper implementation.
Supply, installation and putting into service a stationary base camp for 120 persons and a mobile camp for 130 persons at the Onal site. These stationary and mobile base camps were designed and created at the Onal site in a 4-month period in 2007-2008, as part of an EPCI contract.
Five 1570 kVA, 6600 volt gas generators in shelters. ETE performed studies, designed the technical and other specifications, prepared the invitation to tender and managed submissions, selected suppliers and delivered the installation to the worksite in an isolated area in the upstream phase.
For this project, an EPCI contract for Maurel & Prom, ETE performed studies, technical and other specifications, managed tender and submissions, selected suppliers, provided engineering and complete management of procurement in the upstream phase.
Maintenance work with shutdown of a Combustion Turbine chimney for the EDF plant in Dégrad des Cannes. This maintenance operation was carried out by ETE teams on the customer’s site and in ETE workshops in Guiana.
This integrated contract, implemented for EDF between 2003 and 2004, includes engineering, equipment supply, construction and installation of 3 generators for an oil-fired power plant, with connection to the EDF network. Maintenance of existing engines as well.
Integrated contract for ENI (formerly Zetah Congo) comprising: engineering, equipment supply, construction and installation (EPCI) of the M’Boundi water injection system. Completed in 16 months between 2005 and 2006.
This integrated contract for Zetah Congo, completed in 8 months (in 2002) includes engineering, equipment supply, construction and installation (EPCI).