CONGO – Water injection project at M’Boundi
Implementation of a water injection project at the M’Boundi extraction site and supply of 4 injection pumps with a 94 m3/h capactity at 275 bar
This integrated contract for ENI (formerly Zetah Congo), implemented between 2005 and 2006, included engineering, equipment supply, construction and installation (EPCI) of the M’Boundi water injection system.
ETE designed the technical and other specifications for the invitations to tender and later oversaw all procurement (engineering, purchasing, logistics, delivery to the work site), laying the pipe, coordinating work at the site and putting the installation into service.
The contract to supply 4 injection pumps included engineering studies, definition of product specifications with the constructor, procurement, tests, installation and commissioning.
The project was completed in 16 months.